DOST-GIA EXECOM MEETING NO. R2024-04 13 May 2024;

OSEC Conference Room; 4th Floor DOST Main Building

 

OPENING PRAYER to be led by the Secretariat (9:00  - 9:05 PM/5 minutes) 

A. Approval of the Provisional Agenda (9:10 - 9:15 PM/5 minutes discussion)

B. Approval of the Minutes of the Previous Meeting  (9:15 - 9:20 PM/5 minutes discussion) 

C. Secretary's Remarks (9:25 - 9:45 AM/20 minutes)

D. Programs/Projects for Discussion:

                        

No.

Target Time of Presentation/ Q&A  PROGRAM/PROJECT NATURE OF REQUEST/S&T FIELD/ FUNCTION  IMPLEMENTING/ MONITORING AGENCY Status 
PCAARRD New Programs/Projects

1

 

9:50 AM
0:30
minutes
discussion &
Q&A

OPERATIONALIZATION OF THE PAGTANAW 2050, THE PHILIPPINES ST&I FORESIGHT

 

 

Project 1. Development of the PAGTANAW 2050, the Philippine ST&I Foresight Indicator

 

 

Project 2. Integration of the PAGTANAW 2050 Into the DOST Foresight Framework: Advancing the Philippine ST&I

Foresight Advisory Function of NAST PHL

 

 

Project 3. Development of the DOST Foresight for Future Planning Training Series

 

 

Project 4. A Strategic Communication Plan: Mainstreaming
the PAGTANAW 2050

 

Two (2) Years
Policy Advocacy
1.d

National Academy
of Science and
Technology (NAST)

 

 

 

NAST

 

 

 

DOST

 

 

NAST

 

DONE

 2

 

10:20 AM
0:30
minutes
discussion &
Q&A

NICER: TAMARIND R&D CENTER (Phase II)

Date of PCAARRD Endorsement: 29 April 2024


Project 1. Postharvest Handling and Management of Tamarind
Project 2. Design and Development of Mechanized Tamarind-De-Shelter and De-Seeder

 

 

 

Project 3. Tamarind Paste Concentrate: An Intermediary Food and Its Applications

Three (3) Years
R&D - Agriculture
1.a
(re-tabled)

 

 

 

Three (3) Years
R&D - Agriculture
1.a
(re-tabled)
(under PCIEERD)

Pampanga State
Agricultural
University (PSAU)

DONE
PCAARRD Ongoing Programs/Projects for Renewal
 3  10:50 AM
0:20
minutes
discussion &
Q&A

VIROLOGY AND VACCINE RESEARCH PROGRAM: DEVELOPMENT OF MITIGATING STRATEGIES FOR THE COCONUT CADANG-CADANG THREAT

 

Date of PCAARRD Endorsement: 29 April 2024


Project 2. Transcriptomics Analysis of Healthy and Cadang-Cadang-Infected Palms

Duration: 16 May 2024 - 15 May 2024 (Y2 of 3 Years)

Year 2 Renewal
with Carryover of
Year 1 UB
R&D - Agriculture
1.a

Philippine Coconut Authority (PCA)

75% accomplished
targets
64% fund utilization

DONE
   

Project 3. Application of Antisense Technology for the Coconut Cadang-Cadang Disease: A Proof of Concept Study

Duration: 16 May 2024 - 15 May 2024 (Y2 of 2 Years)

    DONE
PCAARRD Ongoing Programs/Projects with Reprogramming Request
 4  11:10 AM
0:20
minutes
discussion &
Q&A

NICER: GARLIC AND OTHER AGRI-FOOD CONDIMENTS R&D CENTER


Date of PCAARRD Endorsement: 29 April 2024


Project 1. Collection, Characterization, Conservation, and Improvement of Garlic and Other Agri-Food Condiments Genetic Resources in the Philippines


Year 3 Duration: 01 May 2023 - 30 April 2024 (Year 3 of 3 Years)

Extension Period: 01 May 2024 - 30 April 2025 (12 months)

Date of PCAARRD Approval of the Extension Period: 04 April 2024


Project 2. Improvement of Garlic and Other Agri-Food Condiments Productivity through Integrated Crop Management System

 

 Use of UB
During the
Extension Period
R&D - Agriculture
1.a

Mariano Marcos
State University
(MMSU)

DONE
NRCP-Monitored Projects for Renewal

 

5
 

Three Year Science, Technology and Innovation (STI) Legislative Advocacy Program


Date of NRCP Endorsement: 21 March 2024
Year 2 Duration: 01 May 2023 – 30 April 2024 (Y2 of 3 Years)

Year 2 Renewal
Policy Advocacy
1.d

DLLO

DONE

 

6
 

GAGAMBA (GAmot mula sa GAgamba at Mananaliksik para sa BAyan):

Project 2. Bioactivity and Pre-clinical Pharmacologic Analysis of Venom Components


Date of NRCP Endorsement: 30 April 2024
Year 2 Duration: 01 June 2024 - 31 May 2025 (Y2 of 3 Years)

Year 2 Renewal
with Carryover
of Year 1 UB
R&D - Basic
Research
1.a

UST

DONE
NRCP-Monitored Projects with Reprogramming Request

 

7

11:30 AM
0:15
minutes
discussion &
Q&A

3DSMC: Mining the Diverse Actinomyctes from Deep and Dark Matter of Philippine Seas for Small Molecules Against COVID-19


Date of NRCP Endorsement: 02 April 2024
Year 2 Duration: 01 May 2023 - 30 April 2024 (Y2 of 2 Years)

Extension Period: 01 May 2024 - 31 October 2024 (6 months)

Date of NRCP's Approval on the Extension Period: 02 April 2024

 

Additional Implementing Agency (PAGASA) and Transfer of Budget Allocation Use of Unreleased
Funds During the
Extendion Period
R&D - Basic
Research
1.a

 

University of San
Agustin (USA)
DONE
 8  11:45 AM
0:15
minutes
discussion &
Q&A

ANTIMICROBIAL DISCOVERY IN MANGROVE SOILS OF ALABAT ISLAND, QUEZON


Project 2. Characterization of Antimicrobial Compounds Produced by Mangrove Soil Microorganisms of Alabat island, Quezon

 

Date of NRCP's Endorsement: 02 May 2024
Year 2 Duration: 01 June 2023 - 31 May 2024 (Year 2 of 2 Years)

Extension Period: 01 June - 31 December 2024

Date of NRCP Approval of the Extension Period: 30 April 2024

Request for use of
UB during
Extension Period
R&D - Others
1.a

4 UP-Manila (UPM)   DONE
LUNCH BREAK 12:05 - 12:45/40 minutes
PCHRD Ongoing Programs/Projects for Renewal
 9  12:50 PM
0:30
minutes
discussion &
Q&A
 

VIROLOGY AND VACCINE RESEARCH PROGRAM (VRP): MOLECULAR CHARACTERIZATION AND BIOBANKING OF VECTOR-BORNE AND RESPIRATORY VIRUSES FOR THE VIROLOGY AND VACCINE INSTITUTE OF THE PHILIPPINES (VRV BIOBANKING)

 


Date of PCHRD Endorsement: 29 April 2024

Project 1. Biorepository of Human Respiratory Virus with Risk Group Level 2 Infections in Selected Tertiary Hospitals in Luzon


Year 2 Duration: 29 May 2024 - 28 May 2025 (Y2 of 2 Years)

 

Project 2. Molecular Profiles and Biobanking of Vector-borne Viruses in Selected Tertiary Hospitals in Luzon

Year 2 Duration: 29 May 2024 - 28 May 2025 (Y2 of 2 Years)

 Y2 Renewal with
Carryover of
Year 1 UB
R&D - Health
1.a
 Industrial Technology
Development Institute
(ITDI)
 DONE
10 1:20 PM
0:30
minutes
discussion &
Q&A
 

STRENGTHENING THE UP DRUGS OF ABUSE RESEARCH LABORATORY CAPABILITY: GETTING A GRIP ON THE DRUG MENACE IN THE PHILIPPINES

 

Date of PCHRD Endorsement: 26 March 2024

 


Project 1: Analysis of Substances of Abuse in Serum and Hair Using Liquid Chromatography-Quadrupole-Time of Flight Mass Spectrometry (LC-QTOF/MS)


Year 2 Duration: 01 April 2024 – 31 March 2025 (Year 2 of 2 Years)

 

Project 2: Clinical Validation of the POCT Device (E-tox) for Selected New Psychoactive Substance (NPS)

Year 2 Duration: 01 April 2024 – 30 September 2024 (0.5 Year of 1.5 Years)

 
Project 3: Phenotypic and Genotypic Characterization of
Methamphetamine Metabolism Among Filipino Users

Year 2 Duration: 01 April 2024 – 31 March 2025 (Year 2 of 3 Years)

Year 2 Renewal
with Carryover of
Year 1 UB and
Additional Funding
R&D - Health
1.a
 UP-Manila (UPM)  DONE
11 1:50 PM
0:30
minutes
discussion &
Q&A
 

NICER:NEOLIMB: CENTER FOR RESEARCH ON REHABILITATION AND ASSISTIVE TECHNOLOGIES FOR MOBILITY

 

Date of PCHRD Endorsement: 17 April 2024


Project 1. Prosthetic Socket Development Using Renewable Materials

Year 2 Duration: 15 May 2024 – 14 May 2025 (Year 2 of 3 Years)

 


Project 2. Development of Printable BioLiner for Prosthetic Devices

Year 2 Duration: 15 May 2024 – 14 May 2025 (Year 2 of 3 Years)

 

Project 3. Enhancement of the Gait Measurement System Using a Digital Inclinometer

Year 2 Duration: 15 May 2024 – 14 May 2025 (Year 2 of 2 Years)


Project 4. Remote Scanning and Fabrication of Prosthetic and Orthotic Devices and Service Delivery Model Development


Year 2 Duration: 15 May 2024 – 14 May 2025 (Year 2 of 3 Years)


R&D - Health
1.a
University of the East
Ramon Magsaysay
Memorial M
Center (UERMMMC)
 DONE
 12 2:20 PM
0:20
minutes
discussion &
Q&A
 

VIROLOGY AND VACCINE RESEARCH AND DEVELOPMENT PROGRAM (VRP): Mycobacterium Tuberculosis EAI2-Manila Strain-Derived Immunogenic Protein Subunits for TB Vaccine Development

 


Date of PCHRD Endorsement: 29 April 2024
Year 2 Duration: 11 June 2024 – 10 December 2025 (Year 2 of 1.5 Years)

Year 2 Renewal
with Carryover of
Year 1 UB
R&D - Health
1.a
 Industrial Technology
Development Institute
(ITDI)
 DONE
 13 2:40 PM
0:20
minutes
discussion &
Q&A
 

PROMOTING HEALTHY FILIPINO LIVER THROUGH INTERDISCIPLINARY INNOVATIVE RESEARCH (PHIL LIVER) - UPM-NIH LIVER RESEARCH PROGRAM AND THE PHILIPPINE LIVER RESEARCH NETWORK: Liquid Biopsy-based BIomOlecular Markers for the PrognoStication of HEpatocEllular Carcinoma in Filipinos
(Liquid-BIOPSEE)

 


Date of PCHRD Endorsement: 24 April 2024
Year 2 Duration: 10 June 2024 – 09 June 2025 (Year 2 of 5 Years)

Year 2 Renewal
with Carryover of
Year 1 UB
R&D - Health
1.a
UP-Manila  DONE
 14 3:00 PM
0:30
minutes
discussion &
Q&A
 

MULTI-OMICS RESEARCH PROGRAM FOR HEALTH (MORPH)


Conditionally Approved by the DOST-GIA EXECOM on 21 February 2024

Date of PCHRD Endorsement: 26 April 2024

Project 1: Monitoring Drug Efficacy through Multi-Omics Research Initiative in Alzheimer’s Disease (MEMORI-AD)

Year 3 Duration: 15 February 2024 – 14 February 2025 (Year 3 of 3 Years)

 


Project 2: Molecular Epidemiology of Mycobacterium Tuberculosis and Human Immunodeficiency Virus and Immunophenotyping of Adult Filipino TB/HIV Co-infected Patients

 

Year 3 Duration: 15 February 2024 – 14 February 2025 (Year 3 of 3 Years)


Project 3: Determinants of Acquisition, Persistence, and Clearance of Oncogenic Cervical Human Papillomavirus Infection in a Cohort of Women in Rural and Urban Philippines Using a Multi-OMICS Approach

 

Year 3 Duration: 15 February 2024 – 14 February 2025 (Year 3 of 3 Years)

Year 3 Renewal with Carryover of Y2 UB


R&D - Health
1.a

UP-Manila (UPM)  DONE
 15    

FUNCTIONAL FOODS PROGRAM ON PHILIPPINE SEAWEEDS:

Project 1. Evaluation of Nutrient Compositions, Potential Health-Promoting Properties and Harmful Components in Selected Edible Seaweeds in the Philippines


Date of PCHRD Endorsement: 04 April 2024
Year 2 Duration: 20 March 2024 – 19 March 2025 (Year 2 of 2 Years)

Year 2 Renewal
with Carryover
of Year 1 UB and
Year 1 Unreleased
Funds (UF)
R&D - Health
1.a
FNRI  DONE
 16    

INSECTICIDE RESISTANCE MONITORING IN AEDES FOR SUSTAINABLE VECTOR CONTROL (IRMAe)


Date of PCHRD Endorsement: 29 April 2024

 

Project 1. Aedes Insecticide Resistance Status (AIRS) in NCR

Year 2 Duration: 01 July 2024 – 30 June 2025 (Year 2 of 3 Years)

 

 


Project 2. Insecticide Resistance Survey and Tracking in Aedes Vectors of Dengue Through Molecular Tools
(AeRTrackS)

 

Year 2 Renewal
with Carryover
of Year 1 UB
R&D - Health
1.a
DOH - Metro Manila
Center for Health
 DONE
 17    

IMMUNOLOGICAL MODELS FOR MEDICALLY USEFUL NOVEL ENTITIES (IMMUNE): Project 2. IMMUNE-Models

 

Date of PCHRD Endorsement: 27 March 2024
Year 2 Duration: 16 May 2024 – 15 May 2025 (Year 2 of 3 Years)

Year 2 Renewal
with Carryover of
Year 1 UB and
Re-Classification
of MSU-IIT as
Co-Implementing
Agency
UP-Diliman (UPD)  DONE
PCHRD Ongoing Programs/Projects with Reprogramming Requests
 18 3:30 PM
0:15
minutes
discussion &
Q&A
 

STRENGTHENING THE UP DRUGS OF ABUSE RESEARCH LABORATORY CAPABILITY: GETTING A GRIP ON THE DRUG MENACE IN THE PHILIPPINES

 

Project 4. Cost-Effectiveness Analysis of a Validated Non-targeted Drug Testing for Substance Abuse in the Philippines


Date of PCHRD Endorsement: 26 March 2024
Year 1 Duration: 01 April 2023 – 31 March 2024 (Year 1 of 1 Year)

Approved Extension: 01 April 2024 - 31 December 2024 (9 months)

Date of PCHRD's Approval of the Extension Period: 05 April 2024

Use of UB During
the Extension
Period
R&D - Health
1.a
UP-Manila (UPM)  DONE
 19 3:45 PM
0:15
minutes
discussion &
Q&A
 

VIROLOGY AND VACCINE RESEARCH PROGRAM (VRP): 3D-HEP-DD: Local Adoption of a Robust 3D-Bioprinted HEPatic Model for Antiviral Drug Discovery Research

 

Date of PCHRD Endorsement: 26 April 2024

Proposed Revised Title: 3D-HEP-DD: Local Adoption of a Robust 3D HEPatic Model for Antiviral Drug Discovery Research


Year 1 Duration: 01 October 2022 - 30 September 2023
(Y1 of 1 Year)
First Extension Period: 01 October 2023 - 31 March 2024 (6 months)

Second Extension Period: 01 April 2024 - 31 August 2024 (5 months)

Date of PCHRD's Approval of the Extension Period: 26 April 2024

Change in
Methodology and
Title and Use of Y1
Unreleased Funds
During the
Extension Period
R&D - Health
1.a
The Medical City (TMC)  DONE
PCIEERD Ongoing Programs/Project  for Renewal
 20 4:00 PM
0:20
minutes
discussion &
Q&A
 

AI-Assisted Design of Sustainable Functional Nanomaterials: From Agricultural Biowaste to Applications in Smart Sensing


Date of PCIEERD Endorsement: 01 April 2024

Three (3) Years
R&D - Emerging
Technology
1.a
Ateneo De Manila
University (AdMU)
 DONE
 21 4:20 PM
0:20
minutes
discussion &
Q&A
 

SUSTAINABLE RESOURCE MANAGEMENT THRU CIRCULAR ECONOMY-BASED UTILIZATION OF AGRO-INDUSTRIAL WASTES FOR CONSTRUCTION MATERIALS AND ADMIXTURES WITH CLIMATE CHANGE ACTION CONSIDERATIONS AND IMPLICATION: Project 1. Development of Market-Ready Admixtures and SMART Lightweight Foam Concrete with Passive Energy-Regulating and Self-Reinforcing Properties from Agro-Industrial Wastes for Roof Screeds, Roof Insulation and Wall Applications


Date of PCIEERD Endorsment: 15 April 2024
Year 3 Duration: 18 April 2024 - 17 April 2025 (Year 3 of 3 Years)

Year 3 Renewal
with Carryover
of Year 2 UB
R&D - Others
1.a
Mindanao State
University (MSU)
Iligan Institute
of Technology
(IIT)
 DONE
 22 4:40 PM
0:30
minutes
discussion &
Q&A

CENTER FOR AIR RESEARCH IN URBAN ENVIRONMENTS
Date of PCIEERD Endorsement: 26 April 2024

 

 

Project 1. Towards Green Smart Cities: Connected Embedded Systems for Indoor and Outdoor Air Quality Monitoring
Year 3 Duration: 01 May 2024 - 30 April 2025 (Year 3 of 3 Years)

 

Project 4. Indoor Air Quality Monitoring and Reporting System
Year 3 Duration: 01 May 2024 - 30 April 2025 (Year 3 of 3 Years)

 

 

Project 5. Development of Filter Media, eBC and VOC Sensors for Local Conditions

Year 3 Duration: 01 May 2024 - 30 April 2025 (Year 3 of 3 Years)

R&D - Environment
1.a

 

 

 

Year 3 Renewal
with Carryover
of Year 2 UB
and Additional
Funding

 


Year 3 Renewal
with Carryover
of Year 2 UB
and Additional
Funding

 


Year 3 Renewal
with Carryover
of Year 2 UB

 

 

 

 


UPD-Electrical and
Electronics Engineering
Institute (EEEI)

 

 

 

UPD-Department of
Mechanical Engineering

 

 

 

 

UPD-DME

 DONE
23 5:10 PM
0:30
minutes
discussion &
Q&A
 

CENTRAL HUB FOR ADVANCED MANUFACTURING R&D IN THE PHILIPPINES (CHAMP)


Date of PCIEERD Endorsement: 25 March 2024

 

Project 1: Technological Readiness and Innovation Through Advanced Manufacturing in the Philippines (TRIAMPH)


Year 2 Duration: 01 April 2024 - 31 March 2025 (Year 2 of 3 Years)

 

 

Project 2: Materials for Application-specific Technologies for 3D/4D Printing R&D (MAST3R)

Year 2 Duration: 01 April 2024 - 31 March 2025 (Year 2 of 3 Years)

Year 2 Renewal
with Carryover
of Year 1 UB
R&D - Manufacturing
1.a

 

 

Metals Industry
Research Development
Center (MIRDC)

 

 

Industrial Technology
Development Institute
(ITDI)

 DONE
 24 5:40 PM
0:20
minutes
discussion &
Q&A
 

NICER: CENTER FOR MODERNIZED MARITIME TRANSPORT SYSTEM

 

Date of PCIEERD Endorsement: 22 April 2024
Project 1. Hull Design Standard for Philippine Seawater Typology
Year 2 Duration: 07 March 2024 - 06 March 2025 (Year 2 of 3 Years)

Suspended since 07 March 

 

Date of PCIEERD Endorsement: 30 April 2024
Project 2. Alternative Energy Source Using Sail (AESUS) for Tuna Commercial Fishing Boat

Year 2 Duration: 02 May 2024 - 01 May 2025 (Year 2 of 3 Years)

Year 2 Renewal
with Carryover of
Year 1 UB
R&D -
Transportation
Sector
1.a

University of Cebu
(UC)

 

Society of Naval
Architecture and
Marin Engineers
(SONAME)

 DONE
 25 6:00 PM
0:20
minutes
discussion &
Q&A
 

CRADLE: Upscaled Production of Pectin from Calamansi Wastes

Date of PCIEERD Endorsement: 28 February 2024
Year 2 Duration: 01 March 2024 - 28 February 2025 (Year 2 of 2 Years)

Proposed Start Date of Deferred Implementation: 01 March 2024

Year 2 Renewal
with Carryover of
Year 1 UB
and Deferred
Implementation
R&D - Food
Processing
1.a
ITDI  DONE
PCIEERD Ongoing Programs/Project with Reprogramming Request
 26 6:20 PM
0:15
minutes
discussion &
Q&A
 

E-MINERALS (Extraction of Mineral Nickel and Raw Materials Recovery Leveraging Philippine Local Resources for Energy Storage Applications)

 

Date of PCIEERD Endorsement: 03 April 2024
Year 2 Duration: 01 April 2023 - 31 March 2024 (Year 2 of 2 Years)

Extension Period: 01 April - 21 August 2024 (5 months)
Date of PCIEERD Approval of the Extension Period: 26 March 2024

Use of UB During
the Extension
Period
Sector
1.a
UP-Diliman (UPD)  DONE
 27 6:35 PM
0:15
minutes
discussion &
Q&A
 

SUSTAINABLE RESOURCE MANAGEMENT THRU CIRCULAR ECONOMY-BASED UTILIZATION OF AGRO-INDUSTRIAL WASTES FOR CONSTRUCTION MATERIALS AND ADMIXTURES WITH CLIMATE CHANGE ACTION CONSIDERATIONS AND IMPLICATION:

 

 

Date of PCIEERD Endorsement: 02 May 2024
Project 2. Development of Eco-cement Using Locally Available Industrial Wastes for Construction Applications

Year 2 Duration: 18 April 2023 - 17 April 2024 (Year 2 of 2 Years)

Extension Period: 18 April 2024 - 17 April 2025 (12 mos.)
Date of PCIEERD's Approval of the Extension Period: 14 March 2024

Use of UB During
Extension Period
R&D - Construction
1.a
Central Mindanao
University (CMU)
 DONE
 28 6:50 PM
0:15
minutes
discussion &
Q&A
 

Upgrading the Capability of Existing Distribution Centers/Trading Posts in the Delivery of Fresh and Semi-Processed Agricultural Products in the Supply Chain: Focusing on Packaging Technology and Logistics

 

Date of PCIEERD Endorsement: 26 April 2024
Year 2 Duration: 01 May 2022 - 30 April 2023 (Year 2 of 2 Years)

1st Extension Period: 01 May 2023 - 30 April 2024 (12 months)

Proposed 2nd Extension Period: 01 May 2023 - 30 August 2024 (4 months)

Second Extension
(exceeding 12 months)

Provision of Quality
S&T Service
1.d

DOST CAR, DOST
Region II, III, XII
ITDI (lead)
 DONE
 29 7:05 PM
0:15
minutes
discussion &
Q&A
 

NICER – PROGRAM BOONDOCK: A MOUNTAIN ENGINEERING CENTER TOWARDS SUSTAINABLE INFRASTRUCTURE AND UPLAND WATER SECURITY
Date of PCIEERD Endorsement: 17 April 2024

 

Project 2. Improving the Livelihood of CAR MSMEs thru Cable Supported Water and Transport Infrastructure

Year 2 Duration: 01 June 2022 - 31 May 2023 (Year 2 of 2 Years)

1st Extension: 01 June 2023 - 29 February 2024 (9 months)

Proposed 2nd Extension: 01 March - 31 August 2024 (6 months)

 

 


Project 4. Development of Artificial Groundwater Recharge Facility for Drought and Flooding Mitigation

Year 2 Duration: 01 June 2022 - 31 May 2023 (Year 2 of 2 Years)

1st Extension: 01 June 2023 - 31 May 2024 (12 months)
Proposed 2nd Extension: 01 June to 31 October 2024 (5 months)

R&D - Others
1.a 

 

2nd Extension (Beyond 12 months) and Additional Funding
(beyond 12 mos.)
with Additonal
Funding

 

 

 

 

2nd Extension (Beyond 12 months) and Additional Funding
(beyond 12 mos.)

 

Saint Louis University
(SLU)

 

 

 

 

 


Ecosystems Research
and Development
Bureau (ERDB)

 DONE
 30 7:20 PM
0:15
minutes
discussion &
Q&A
 

CRADLE: Design Improvement of Existing Chain Link Fencing Machine to Produce Slope Protection Circular Wire Mesh


Date of PCIEERD Endorsement: 30 April 2024
Project Duration: 01 April 2022 - 30 June 2023 (0.25 of 1.25 Years)

1st Extension Periond: 01 July 2023 - 31 December 2023 (6 months)

2nd Extension Periond: 01 January 2024 - 31 March 2024 (3 months)

Proposed 3rd Extension Periond: 01 April 2024 - 31 August 2024 (6 months)

PMT Endorsed 3rd Extension Periond: 01 April 2024 - 30 June 2024 (6 months)

3rd Extension
and Use of UB
During the
Extension
Period
R&D - Others
1.a
MIRDC  DONE

E. Matters Arising from the Previous Meeting (Ms. Armela K. Razo) [7:40 - 7:55 PM/15 minutes discussion]
F Councils' Update on the EXECOM Action Sheet
   F.1 NRCP - Dr. Bernardo N. Sepeda (8:00 - 8:05 PM/5 minutes discussion)
   F.2 PCAARRD - Dr. Reynaldo V. Ebora (8:10 - 8:20 PM/10 minutes discussion)
   F.3 PCHRD - Dr. Jaime C. Montoya (8:25 - 8:35 PM/10 minutes discussion)
   F.4 PCIEERD - Dr. Enrico C. Paringit (8:40 - 8:50 PM/10 minutes discussion)
G. Status of DOST-GIA Funds (Allotment and Cash) [8:55 - 9:05 PM/10 minutes discussion)
H. Report on the Liquidation of DOST-GIA Projects (SPD) [9:10 - 9:20 PM/10 minutes]
I. Report on SETUP Projects Approved by the DOST Regional Directors (USec. Sancho A. Mabborang) [9:25 - 9:40 PM/15 minutes]
J. Other Matters: Projects Approved Within the Authority of the Undersecretary [9:45 - 9:55 PM/10 minutes discussion]  

 

K. Adjournment of DOST-GIA EXECOM Meeting (10:00 PM)





Legend (Function):
1.a R&D
1.b Research and Development Results Utilization (RDRU)
1.c Development of Human Resources and R&D Institutions for the S&T Sector (DHR & R&D for the S&T Sector)
1.d Provision of Quality S&T Services, Policy Advocacy, S&T Promotion