DOST-GIA EXECOM Meeting R2025-05

10 June 2025; 9:00 AM; OSEC Conference Room; DOST Main Building

 

OPENING PRAYER to be led by by the Secretariat (9:05 AM/5 minutes)

A. Approval of the Provisional Agenda (9:10 - 9:15 PM/5 minutes discussion)

B. Programs/Projects for Discussion

No.

Target Time of Presentation/ Q&A  PROGRAM/PROJECT NATURE OF REQUEST/S&T FIELD/ FUNCTION  IMPLEMENTING/ MONITORING AGENCY Status 
PART I. NEW PROGRAMS/PROJECTS
DOST R&D Institutes
1

 9:20:00 AM

35 minutes

discussion & Q&A 

RESEARCH AND DEVELOPMENT PROGRAM ON NATIONAL REFERENCE STANDARDS FOR MEASUREMENT TRACEABILITY

Date of PCIEERD Endorsement: 24 May 2025

Project 1. Design and Development of a Low-Pressure Gas Flow Standard System for Traceable Gas Flowrate Calibration in the Philippines

Project 2. Establishment of National Reference Standard Calibration Systems for Ventilator Analyzers, Sphygmomanometers and Blood Pressure Simulators

Project 3. Design and Development of NML's Force Calibration for Weigh-In-Motion Systems of Truck and Aircraft Scales

Project 4. Development of an Electric Vehicle (EV) Charging Unit for Traceable Calibration of EV Charging Stations in the Philippines

Project 5. PROJECT pH: Primary Potentiometric Certification of Reference Buffer Solutions

Project 6. Strengthening Laboratory Competence in the Philippines Through Proficiency Testing Scheme for Aflatoxin in Peanuts and Peanut Based Foods

R&D - Others  1.a

 

ITDI/PCIEERD 

 

 DONE
2

9:550:00 AM

20 minutes

discussion & Q&A 

 

Development and Safety Evaluation of Natural UV Filters from Philippine Agricultural ByProducts for Cosmetic Application

Date of PCIEERD Endorsement: 24 May 2025

R&D - Process Sector 1.a  ITDI/PCIEERD   DONE
3

10:15:00 AM

20 minutes

discussion & Q&A 

 

VIROLOGY AND VACCINE RESEARCH PROGRAM (VRP)
Novel Antiviral Peptides from Mosquito Protein-Protein Interactome Studies Against Zika Virus

 

  R&D - Health  (Infectious Diseases) 1.a  ITDI/PCHRD  DONE
4

10:35:00 AM

20 minutes

discussion & Q&A 

 
 

VIROLOGY AND VACCINE RESEARCH PROGRAM (VRP): ARBO-IMBIODEV: IMMUNE BIOLOGICS DEVELOPMENT FOR CRITICAL ARBOVIRUS INFECTIONS IN THE PHILIPPINES

Project 3. Hepatic and Immune Responses to Lipid Nanoparticles (LNP) in a Dengue-MASLD Model: A Preclinical Study on Vaccine Safety and Disease Interaction

Date of PCHRD Endorsement: 22 May 2025

R&D - Health 1.a   ITDI/PCHRD DONE
DOST S&T Service Institutes
5

 

10:55:00 AM

20 minutes

discussion & Q&A 

 

Probablistic Tsunami Inudation Hazard Assessment and Mapping in the Philippines (PRISTINE)

Date of PCIEERD Endorsement: 24 May 2025

S&T Promotion 1.d 

PHIVOLCS/PCIEERD  DONE
6

11:15:00 AM

20 minutes

discussion & Q&A 

 
Communicating DOST Impact Through Broadcast Program (Science Pinas Season 2)

Date of PCIEERD Endorsement: 23 May 2025

 S&T Promotion 1.d STII/PCIEERD   DONE
DOST Central Office
7

11:35:00 AM

20 minutes

discussion & Q&A 

 

Support to Research Dissemination: Streamlining the Research Dissemination of DOST-Funded or Implemented Projects

Date of NRCP Endorsement: 09 May 2025

 
Innovative HRD 1.c  DOST-OUSec for STS  DONE
8  

11:55:00 AM

20 minutes

discussion & Q&A 

 

Conduct of the National Youth Science, Technology and Innovation Festival 2025

Date of NRCP Endorsement: 09 May 2025

 Innovative HRD 1.c  DOST-OUSec for STS DONE
L U N C H B R E A K (12:10 - 1:00 PM/50 minutes)
PART II. RENEWAL OF ONGOING PROGRAMS/PROJECTS
NRCP-Monitored Project
9  

1:05:00 PM

20 minutes

discussion & Q&A 

 

GAGAMBA (GAMOT MULA SA GAGAMBA AT MANANALIKSIK PARA SA BAYAN): AN OMICS-GUIDED BIOPROSPECTING OF PHILIPPINE SPIDERS):

Project 2. Bioactivity and Pre-clinical Pharmacologic Analysis of Venom Components

Date of NRCP's Endorsement: 08 May 2025

Year 3 Duration: 01 June 2025 - 31 May 2026 (Year 3 of 3 Years)

R&D - Basic Research  1.a. University of Santo Tomas (UST)  DONE
PCHRD-Monitored Programs/Projects
10    

INSECTICIDE RESISTANCE MONITORING IN AEDES FOR SUSTAINABLE DENGUE VECTOR CONTROL (IRMAE)
Date of PCHRD Endorsement: 22 May 2025

Project 1. Aedes Insecticide Resistance Status (AIRS) in NCR
Year 3 Duration: 01 July 2025 - 30 June 2026 (Year 3 of 3 Years)

Project 2. Insecticide Resistance Survey and Tracking in Aedes Vectors of Dengue Through Molecular Tools (AeRTrackS)

Year 3 Duration: 01 July 2025 - 30 June 2026 (Year 3 of 3 Years)

 R&D - Health 1.a

DOH - Metro Manila Center
for Health Development

UP Diliman (UPD)

 

DONE
11

1:25:00 PM

30 minutes

discussion & Q&A 

 
 

NICER NEOLIMB: CENTER FOR RESEARCH ON REHABILITATION AND ASSISTIVE TECHNOLOGIES FOR MOBILITY
Date of PCHRD Endorsement: 16 May 2025

Project 1. Prosthetic Socket Development Using Renewable Materials
Year 3 Duration: 15 May 2025 - 14 May 2026 (Year 3 of 3 Years)
Suspended since 15 May 2025

Project 2. Development of Printable BioLiner for Prosthetic Devices
Year 3 Duration: 15 May 2025 - 14 May 2026 (Year 3 of 3 Years)
Suspended since 15 May 2025

Project 4. Remote Scanning and Fabrication of Prosthetic and Orthotic Devices and Service Delivery
Year 3 Duration: 15 May 2025 - 14 May 2026 (Year 3 of 3 Years)
Suspended since 15 May 2025

  R&D - Health 1.a  University of the East Ramon Magsaysay Memorial Medical Center Inc. (UERMMMCI) DONE
12

1:55:00 PM

20 minutes

discussion & Q&A 

 

 VIROLOGY AND VACCINE RESEARCH PROGRAM (VRP): Evaluation of Acinetobacter baumannii Bacteriophages Against Multidrug-Resistant (MDR) Infections as Alternative Modality for Therapy (AbOT-GAMOT)

Date of PCHRD Endorsement: 22 May 2025

Year 2 Duration: 01 July 2025 - 30 June 2026 (Year 2 of 3 Years)

  R&D - Health 1.a  University of Santo Tomas (UST) DONE
13  

2:15:00 PM

20 minutes

discussion & Q&A 

 

MECO-TECO Joint Research Program (JRP): Diet Control AI Model Designed for Chronic Disease Patient-Based on Personal Health Record and International Data Exchange

Date of PCHRD Endorsement: 22 May 2025
Year 2 Duration: 01 July 2025 - 30 June 2026 (Year 2 of 3 Years)

  R&D - Health 1.a UP Manila (UPM)  DONE
14

2:35:00 PM

30 minutes

discussion & Q&A 

 
 

CENTER FOR MODERNIZED MARITIME TRANSPORT SYSTEM (CMMTS)

Project 1. Hull Design Standard for Philippine Seawater Typolog
Date of PCIEERD Endorsement: 15 May 2025
Year 3 Duration: 07 March 2025 to 16 March 2025 (Year 3 of 3 Years)
Suspended since 07 March 2025

Project 3. Design and Development of Marine Autonomous Surface Ship (MASS) Prototype
Date of PCIEERD Endorsement: 19 May 2025
Year 3 Duration: 14 January 2024 to 13 January 2025 (Year 3 of 3 Years)
Suspended since 14 January 2025 

 R&D - Health 1.a 

University of Cebu (UC)

 Cebu Technological University (CTU)

 DONE
15  

3:05:00 PM

20 minutes

discussion & Q&A 

 

Sediment Evaluation and Development of Intervention (SEDI): S&T-Based Approach for Sustainable Management of Reservoirs and River Basins

Date of PCIEERD Endorsement: 21 May 2025
Year 2 Duration: 01 June 2025 to 31 May 2026

 R&D - Health 1.a  Isabela State University (ISU)  DONE
PART III. REPROGRAMMING REQUEST OF ONGOING PROGRAMS/PROJECTS
PCHRD-Monitored Programs/Projects
16

3:25:00 PM

20 minutes

discussion & Q&A 

 

NICER: INSTITUTE OF BIOMEDICAL ENGINEERING AND HEALTH TECHNOLOGIES (IBEHT): R&D CENTER FOR MEDICAL ROBOTICS

Date of PCHRD Endorsement: 19 May 2025

Project 1. SELLA Project: EEG-Integrated Wheelchair Power Unit for Patients  with Physical Disabilities 

Year 2 Duration: 01 June 2023 - 31 May 2024 (Year 2 of Years)

1st Extension Period: 01 June - 31 October 2024 (5 months)

Date of PCHRD Approval of the 1st Extension Period: 31 May 2024

2nd Extension Period: 01 November 2024 - 31 May 2025 (7 months)

Proposed 3rd Extension Period: 01 June - 30 November 2025 (6 months)

 

Project 3. SIGLA: Depression Recognition and Analysis from EEG: Towards Virtual Reality-Based Therapy Program

Year 2 Duration: 01 June 2023 - 31 May 2024 (Year 2 of Years)
1st Extension Period: 01 June - 31 October 2024 (5 months)
Date of PCHRD Approval of the 1st Extension Period: 31 May 2024

2nd Extension Period: 01 November 2024 - 31 May 2025 (7 months)

Proposed 3rd Extension Period: 01 June - 30 November 2025 (6 months)

R&D - Health  1.a  De La Salle University (DLSU) Manila   DONE
17

3:45:00 PM

15 minutes

discussion & Q&A 

 

NICER NEOLIMB: CENTER FOR RESEARCH ON REHABILITATION AND ASSISTIVE TECHNOLOGIES FOR MOBILITY

Date of PCHRD Endorsement: 16 May 2025

Project 3. Enhancement of the Gait Measurement System Using A Digital Inclinometer

Year 2 Duration: 15 May 2024 - 14 May 2025 (Year 2 of 2 Years)

Approved Extension: 15 May 2025 - 14 February 2026 (9 mos.)

Date of Extension Approval: 06 May 2025

R&D - Health  1.a University of the East Ramon Magsaysay Memorial Medical Center Inc.
(UERMMMCI) 
 DONE

PCIEERD-Monitored Programs/Projects

18

4:00:00 PM

15 minutes

discussion & Q&A 

 

MICROGRIDTERPRISES in GIDA thru CEST: Installation of Microgrid Renewable Energy Systems and Establishment of Agri-Agro Microenterprises in Geographical Isolated and Disadvantaged Areas in Selected Provinces of Davao Region through Community Empowerment through Science and Technology

Date of PCIEERD's Endorsement: 05 May 2025

Year 2 Duration: 02 December 2024 – 01 December 2025 (Year 2 of 2 Years)

DOST-GIA EXECOM Approval of Year 2 Renewal: 16 December 2024

Provision of Quality  S&T Service 1.d DOST Region XI   DONE

C. Matters Arising from the Previous Meeting (Ms. Armela K. Razo) [4:20 - 4:35 PM/15-minute discussion]

D. Status of DOST-GIA Funds: Allotment and Cash (Dir Racquel P. Alvendia) [4:40 - 4:50 PM/10-minute discussion)

E. Report on the Liquidation of DOST-GIA Projects (Dir. Racquel P. Alvendia) [4:55 - 5:05 PM/10-minute discussion]

F. Adjournment of the DOST-GIA EXECOM Meeting (5:19 PM)

 

Legend (Function):
1.a R&D
1.b Research and Development Results Utilization (RDRU)
1.c Development of Human Resources and R&D Institutions for the S&T Sector (DHR & R&D for the S&T Sector)
1.d Provision of Quality S&T Services, Policy Advocacy, S&T Promotion